BCD236 – Demobilizing Construction Sites Safely Using NFPA241
Credit: 1 AIA LU/HSW, 0.1 ICC CEU
Due to COVID-19, construction sites are being shut down all over the country. Abandoned and unprotected construction sites pose a risk to the community. During this shutdown it is the goal of the fire service that builders leave their construction site as reasonably fire safe as possible. This program provides guidance that is based on compliance with Chapter 33 of the 2018 International Fire Code, Chapter 33 of the 2018 International Building Code, and NFPA Standards 1 and 241.
Learning Objectives:
Demobilizing Construction Sites Safely Using NFPA241 |